Friday, June 28, 2013

Dream house, the construction starts...

So after 2 years of talking to loan officers, working with the architect and pulling magazine pictures it was time to start construction. I remember feeling surprised and shocked that they actually had a date to start demo. I think on some level I didn't think it would ever happen. Once we moved most of our stuff out we let the kids do a little demo of their own. They had a great time writing on and putting holes in the wall.
IMG_0768

IMG_0769

IMG_0771

The week before demo started we had  a garage sale where we let people bring their own tools and basically buy whatever they could remove. While it was nice to make a few bucks, I was just so happy to recycle things that other people could use, like our wall ovens, hardware, doors, and light fixtures. When they came to demo a few days later it felt so good that these items were not going into the huge trash dumpster.

Finally the first day of demo was upon us. We were all so excited. Within a few days the cabinets, floors, and drywall were gone. Let me tell you it is so much faster tearing it down than building it up.

IMG_0813

IMG_0800

IMG_0815

Since we started demo in November, they basically worked from the inside out. Our contractor wanted to leave the roof on just in case we got rain. Once a good chunk of demo was done they poured the foundation for the front addition. Once that was done they opened the sub floor and poured the footings for the second story.

IMG_0956

IMG_0933

After that they demoed whatever was left. Within a few weeks my house was no more. It was a little scary. Everyday I would go by and hope they had started re-building it.

IMG_1032

By mid December the re-build had started. We were very lucky. We only had a few rainy days and the work moved along quickly. By Christmas the new beam had gone in,which would help us achieve the open feel we wanted and the first story was almost framed. Next the stairs were getting built.

IMG_1224

In January they started on the second story. I remember the first time they let us walk up there. There were no walls, just the sub floor. It was our first glimpse into our master retreat. We were so excited.

IMG_1228

By the end of January, we had what appeared to be a new house. It was amazing how much work happened in less than 12 weeks. IMG_1295

Next came the inner working of the house. HVAC, electrical, and plumbing all had a lot of work to do before the walls were closed up. There were days where I swore no work was being done, but then I would go in & see wires running in the open walls. Now when people come over and look at our house I always tell them all our money is in the walls. I know the inner workings are very important, but I was ready to get to the stuff I could see; fixtures, hardwood, tile, and maybe even cabinets. I learned I still had a way to go. Slowly over the next three months the windows went in, they wrapped the outside of the house to protect it from moisture, and they worked inside. They did more work on the HVAC, plumbing, and electrical, as well as, installing shower pans and bath tubs, built-in cabinets got framed, and the fireplace went in. Slowly it was coming together.

IMG_1390

IMG_1376

Finally in March they insulated and put the dry wall up. All of a sudden I had a house!

IMG_1425

Check back next week for Construction, Part 2, the stuff you can see!

Enjoy!